FY 2021 Educational Facilities Master Plan

01 Beaver Run

Facility Needs

1.14.507 Replacement School - Construction Originally constructed in 1958 this 58,893sf Pk- 2 school has had several renovations and additions over the years but will have an average age of 45 by 2019. This school has been identified with a high FQI of 109 due to several systemic problems including HVAC, roofing, windows, electrical and plumbing systems. The school also lacks the space necessary to support current instructional needs. This school requires a comprehensive solution to resolve the many systemic and programmatic issues. Project Description Design and construct a replacement school behind the existing school based on the information gathering in the approved Feasibility and Educational Specification. Project Notes

Proceeding with the Feasibility Study and Ed Spec utilizing Capital Outlay funding. The six existing systemic projects have been removed from the CIP with the authorization of the replacement school.

Wicomico County Public Schools Educational Facilities Master Plan FY 2020

116

Made with FlippingBook Ebook Creator