FY 2021 Educational Facilities Master Plan
03 East Salisbury Elementary
Facility Needs
3.04.381 Limited Renovation - Studies / Planning Major Renovation to the existing school to address the aging infrastructure. Several systemic projects including HVAC, roofing, windows, electrical and plumbing systems have been deferred and the oldest portions of the building continue to age. Project Description Study viable options to address the antiquated systems. Total cost is an estimate only and must be adjusted to the project chosen during the feasibility study. 3.13.542 Systemic Renovation - HVAC A portion of the existing HVAC systems have reached the end of their useful life. Project Description Provide new energy efficient HVAC systems based on latest codes and available technologies. 3.13.545 Systemic Renovation - Lighting Systems Lighting systems and ceilings have passed their useful life in a majority of the school. Upgrades are needed in order to provide adequate lighting levels and additional operational efficiencies. Project Description Upgrade lighting fixtures and associated ceilings that have exceeded their useful lives. Project includes electrical service upgrades and branch wiring as required to accommodate new lighting. 3.13.551 Systemic Renovation - Plumbing The fixtures, finishes, accessories and partitions in the gang toilet rooms in the main building have either already reached or will be reaching the end of their life cycle, which necessitates replacement. Project Description Renovate existing gang toilet rooms in the main building. Analyze toilet rooms for accessibility.
Wicomico County Public Schools Educational Facilities Master Plan FY 2020
123
Made with FlippingBook Ebook Creator