FY 2021 Educational Facilities Master Plan

04 Fruitland Primary

Facility Needs

4.6.522 New, Replacement, or Renovation - Studies / Planning A majority of the buildings systems have now passed their useful life. Project Description

Study the possibility of undertaking a major capital project to address all identified systemic projects as well as address identified architectural issues. Total cost is an estimate only and must be adjusted to the project chosen during the feasibility study. 4.06.475 Systemic Renovation - HVAC Unit vents in areas A and C are scheduled for replacement, they will be over 30 years old in 2020. Packaged Roof top units in areas B and C are scheduled for replacement, they will be over 32 years old in 2020. Project Description Provide new energy efficient HVAC systems based on latest codes and available technologies. 4.06.273 Systemic Renovation - Lighting Systems Lighting systems and ceilings have passed their useful life. Upgrades are needed in order to provide adequate lighting levels and additional operational efficiencies. Project Description Upgrade lighting fixtures and associated ceilings that have exceeded their life cycle. Project includes electrical service upgrades and branch wiring as required to accommodate new lighting. 4.06.450 Systemic Renovation - Plumbing The fixtures, finishes, accessories and partitions in the bathrooms in areas A through E have either already reached or will be reaching the end of their life cycle, which necessitates replacement. Project Description Renovate existing toilet rooms in areas A through E. Analyze toilet rooms for accessibility.

Wicomico County Public Schools Educational Facilities Master Plan FY 2020

126

Made with FlippingBook Ebook Creator