FY 2021 Educational Facilities Master Plan

05 Fruitland Intermediate

Facility Needs

5.13.573 Systemic Renovation - Gen. Carpentry The existing subfloor was recently damaged due to termites and needs to be repaired and/or replaced. Project Description Replace and/or repair subfloor and associated joists per the engineering analysis. Includes new floor finishes as necessary. 5.13.536 Systemic Renovation - HVAC Multiple HVAC systems will be reaching the end of their useful life. Project Description Provide new energy efficient HVAC systems based on latest codes and available technologies. 5.13.534 Systemic Renovation - Lighting Systems Lighting systems and ceilings have passed their useful life. Upgrades are needed in order to provide adequate lighting levels and additional operational efficiencies. Project Description Upgrade lighting fixtures and associated ceilings that have exceeded their useful lives. Project includes electrical service upgrades and branch wiring as required to accommodate new lighting. 5.13.533 Systemic Renovation - Security and/or Fire Alarm The existing fire and security alarm systems have reached the end of their useful life. Project Description Upgrade or replace the existing systems. 5.13.535 Systemic Renovation - Windows / Doors/ Hdwr The existing exterior aluminum windows and doors have reached the end of their useful life. Project Description Replace the existing exterior windows and doors.

Wicomico County Public Schools Educational Facilities Master Plan FY 2020

129

Made with FlippingBook Ebook Creator