46.06.519 Systemic Renovation - Plumbing Wicomico High School is unique in that it is a large campus style school. Throughout the sprawling campus, the original domestic water piping is corroding from the inside out. Associated piping is becoming clogged with particles and with that, it is recommended that all of the interior and exterior (to the main) domestic water piping be replaced. Along the same lines, the original sewer piping continues to age with each passing year. These pipes shall be monitored and replaced when necessary. Project Description Working in phases, replace the original domestic and sewer piping throughout the school campus. A few design will be necessary to determine if the funding amount will be adequate. 46.13.547 Systemic Renovation - Plumbing The auditorium toilet room fixtures, finishes, accessories and partitions have reached the end of their life cycle, which necessitates replacement. Project Description Renovate existing auditorium toilet rooms. Analyze toilet rooms for accessibility.
46.06.366 Systemic Renovation - Roofs As part of the Roof Refurbishment Program this school is due for a roof replacement.
Project Description Identified Buildings throughout the campus are due for roof replacements for a total of 210,776 sq.ft., average age of roof area will be 33 to 39 in 2021.
Wicomico County Public Schools Educational Facilities Master Plan FY 2020
166
Made with FlippingBook Ebook Creator