FY 2021 Educational Facilities Master Plan
45 Wicomico Middle
Facility Needs
45.06.453 Site - Fields and Grounds Existing tennis courts are failing.
Project Description Refurbish and or replace the existing tennis courts as required include upgrades for all surfaces, fencing & permanent equipment. Provide for major repairs and renovation needed and/or convert to school hard surface use.
45.11.564 Site - Paving / Parking Lots Parking has become overcrowded. Project Description
Study potential parking expansion options. Funding for study only.
45.13.540 Systemic Renovation - HVAC A portion of the HVAC system has reached the end of its useful life. Project Description Provide new energy efficient HVAC systems based on latest codes and available technologies. 45.06.459 Systemic Renovation - Lighting Systems Lighting systems and ceilings have passed their useful life. Upgrades are needed in order to provide adequate lighting levels and additional operational efficiencies. Project Description Upgrade lighting fixtures and associated ceilings in areas A through C that have exceeded their useful lives. Project includes electrical service upgrades and branch wiring as required to accommodate new lighting. 45.06.460 Systemic Renovation - Plumbing The fixtures, finishes, accessories and partitions in all toilet rooms in areas A through C have either already reached or will be reaching the end of their life cycle, which necessitates replacement. Project Description Renovate existing toilet rooms in areas A through C. Analyze toilet rooms for accessibility.
Wicomico County Public Schools Educational Facilities Master Plan FY 2020
155
Made with FlippingBook Ebook Creator